Custom Fasteners · Drawing & Sample Service
T2 high-value lines: special bolts, U-bolts and clamps, curtain wall fittings, formwork parts and machinery OEM components. Engineering review before quotation, with tooling, sampling, PPAP and FAI support.
Six steps from drawing to container
Every step has a defined deliverable and date — no week-long quotes, no samples that miss the drawing.

图纸 / 样品
发 CAD、PDF 或实物样品

工艺评审
冷镦 / 机加工可行性判断

报价
2 个工作日,含开模费

打样
7–10 天寄样确认

批量生产
首件检验 + 过程巡检

质检出货
报告随货,FOB/CIF 均可
What we can actually make
Not sure it is feasible? Send the drawing — we answer feasibility within 24 hours.
Materials
- Carbon Q235/Q345/45#/40Cr/35CrMo
- Stainless 304/316/410
- Aluminium 6063-T5/6005-T5
- Brass, nylon on request
Finishes
- Zinc / HDG 45–86μm
- Dacromet / zinc-flake
- Black oxide / phosphate
- Passivation / anodising / Geomet
Drawing formats
- PDF with tolerances
- DWG / DXF 2D
- STEP / IGES 3D
- Physical sample or clear photos
Standards
- DIN / ISO / GB / ANSI / AS
- EN 1090 / EN 14399
- Customer standards
- Tolerance to ±0.05 mm
Two de-identified cases — the process is the point
Client names removed; working conditions, process and delivery data kept.
Special bracket · SS316
A façade contractor needed a non-standard bracket; the incumbent quoted 45 days with no mill certificate. We cold-headed and machined from their STEP file: sample in 12 days, production in 28, with EN 10204 3.1 and FAI.
60,000 pcs/yr · SS316 · passivated · PPAP level 3
Bent U-bolt · 40Cr quenched & tempered
An agricultural OEM welded two parts together. We replaced it with a one-piece bent U-bolt and double nuts — one welding step removed, unit cost down 11%, 100% tensile check.
120,000 pcs/yr · 40Cr Q&T · Dacromet · tensile records
Send a drawing, get a quote in 2 business days
CAD (DWG/DXF), PDF, STEP and photos accepted. Upload multiple files at once. Drawings are used for quotation only; NDA available on request.
- MOQ 500 pcs depending on process
- Tooling: one-off, creditable against volume
- Sample lead time 7–10 days
- Production 25–45 days
Feasibility confirmed within 24 hours